Underlying Traffic Signal Control: The Key to Effective Transit Signal Priority
On MBTA Route 39, buses lose an average of 43 s at the Perkins and Bynner Street intersections. Green Extension alone helps little, but paired with TSP-friendly signal timing and intersection layout it cuts bus delay to about 5 s and pedestrian wait by more than 60%, with no added auto delay in PTV Vissim simulations.
Recommended citation
Obeng-Amoako, N. D., & Furth, P. (2025). "Underlying Traffic Signal Control: The Key to Effective Transit Signal Priority. A Case Study of MBTA Bus Route 39 along South Huntington Avenue, Boston, MA." Poster, MassDOT Transportation Innovation Conference, Worcester, MA, May 2025.